Ford Ecosport Owners and Service Manuals

Ford Ecosport: Body and Paint / Body Closures

Removal and Installation - Hood

Removal NOTE: Removal steps in this procedure may contain installation details. NOTE: This step is only necessary when installing a new component...

General Procedures - Front Door Alignment

Inspection NOTE: LH side shown, RH side similar. Check the body-to-front door dimensions. Refer to: Body and Frame (501-26 Body Repairs - Vehicle Specific Information and Tolerance Checks, Description and Operation)...

Other information:

Ford Ecosport 2014-2025 Service and Repair Manual: Description and Operation - Engine - Overview


Overview The 2.0L Duratec GDI engine which may also be described with these terms: GDI - Gasoline direct injection DI - Direct injection TIVCT - Twin independent variable camshaft timing I4 - 4 cylinder engine 16 V - 4 valves per cylinder 4V - 4 valves per cylinder, 16 valves total FSAO 2...

Ford Ecosport 2014-2025 Service and Repair Manual: Description and Operation - Transmission Description - Overview


Overview This automatic transmission is a 6-speed transmission with electronic shift control. It is designed for operation in a transverse powertrain for FWD and AWD vehicles. This transmission has a 4-element torque converter design, which includes a TCC and a geartrain with 3 planetary gearsets...

Categories

Removal and Installation - Oil Pressure Switch

Materials

Name Specification Motorcraft® Thread Sealant with PTFE
TA-24-B WSK-M2G350-A2
 

Removal

NOTE: Removal steps in this procedure may contain installation details.

With the vehicle in NEUTRAL, position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
If equipped, remove the bolts and the underbody shield.

read more

Copyright © 2025 www.foecosport2.com