Activation
Phase 1 - Leak Verification
Run the EVAP Test with the scan tool.
NOTE:
Some small leaks may not be detected using the EVAP Test. If the system
has passed the test but a leak is still suspected, then proceed to
Phase 2.
If the EVAP system failed the EVAP Test, then proceed to Phase 2.
Phase 2 - System Leak Check
Disc..
B00D5:11, B00D5:12 and B00D5:13
Refer to Wiring Diagrams Cell 46 for schematic and connector information.
Normal Operation and Fault Conditions
The RCM briefly activates each LED in the PAD indicator to prove-out
and verify correct functional operation of the PAD indicator to the
occupants.
The RCM monitors the PAD indicator power supply and "OFF" LED circuits for the follo..