Ford Ecosport: Battery and Charging System / Battery, Mounting and Cables
Inspection and Verification
Verify the customer concern by operating the charging system.
Before diagnosing or repairing the charging system inspect the following items:
Check the battery for loose, damaged or corroded connections...
Battery Specifications
Vehicles with AUTO-START-STOP
Item
Specification
Voltage
12 Volts
Cold Cranking Amps (CCA) measured at -18 C (-0...
Other information:
System Operation
Programmable Module Installation (PMI)
Programmable
Module Installation (PMI) is a scan tool process which configures
settings in a new module. Data used for the Programmable Module
Installation (PMI) process is automatically downloaded from the original
module and stored when a scan tool session is started...
Removal
With the vehicle in N , position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
Remove the air cleaner.
Refer to: Air Cleaner (303-12B Intake Air Distribution and Filtering -
1...