Ford Ecosport: Transmission Cooling - 6-Speed Automatic Transmission – 6F35 / Removal and Installation - Cooler Bypass Valve
Removal
NOTE:
Removal steps in this procedure may contain installation details.
-
With the vehicle in N , position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
-
Remove the transmission fluid cooler tubes bracket bolt.
Torque:
89 lb.in (10 Nm)
-
NOTE:
Be prepared to collect escaping fluid.
Completely loosen the transmission fluid cooler tube fittings from the cooler bypass valve.
-
Loosen the nut and remove the cooler bypass valve.
Torque:
80 lb.in (9 Nm)
Installation
-
To install, reverse the removal procedure.
-
Check the transmission fluid level and adjust as necessary.
Refer to: Transmission Fluid Level Check (307-01B Automatic
Transmission - 6-Speed Automatic Transmission – 6F35, General
Procedures).
Special Tool(s) /
General Equipment
Transmission Cooling System Heated Flusher
Materials
Name
Specification
Motorcraft® MERCON® LV Automatic Transmission FluidXT-10-QLVC
WSS-M2C938-AMERCON® LV,
Flushing
NOTICE:
If the transmission plastic baffle melted due to an overheat
condition, install a new cooler...
Removal
NOTE:
Removal steps in this procedure may contain installation details.
Refer to: Radiator (303-03B Engine Cooling - 1...
Other information:
Removal
NOTE:
LH side shown, RH side similar.
NOTE:
Removal steps in this procedure may contain installation details.
Remove the front door glass run and bracket.
Refer to: Front Door Glass Run and Bracket (501-11 Glass, Frames and Mechanisms, Removal and Installation)...
System Operation
Positive Crankcase Ventilation (PCV) System
The PCV system circulates crankcase gases through the intake air
system into the engine where they are burned. The PCV system regulates
the amount of ventilated air and blowby gases to the intake manifold...