Ford Ecosport: Transmission Cooling - 6-Speed Automatic Transmission – 6F35 / Removal and Installation - Cooler Bypass Valve
Removal
NOTE:
Removal steps in this procedure may contain installation details.
-
With the vehicle in N , position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
-
Remove the transmission fluid cooler tubes bracket bolt.
Torque:
89 lb.in (10 Nm)
-
NOTE:
Be prepared to collect escaping fluid.
Completely loosen the transmission fluid cooler tube fittings from the cooler bypass valve.
-
Loosen the nut and remove the cooler bypass valve.
Torque:
80 lb.in (9 Nm)
Installation
-
To install, reverse the removal procedure.
-
Check the transmission fluid level and adjust as necessary.
Refer to: Transmission Fluid Level Check (307-01B Automatic
Transmission - 6-Speed Automatic Transmission – 6F35, General
Procedures).
Special Tool(s) /
General Equipment
Transmission Cooling System Heated Flusher
Materials
Name
Specification
Motorcraft® MERCON® LV Automatic Transmission FluidXT-10-QLVC
WSS-M2C938-AMERCON® LV,
Flushing
NOTICE:
If the transmission plastic baffle melted due to an overheat
condition, install a new cooler...
Removal
NOTE:
Removal steps in this procedure may contain installation details.
Refer to: Radiator (303-03B Engine Cooling - 1...
Other information:
Special Tool(s) /
General Equipment
Grinder
Hot Air Gun
Knife
Locking Pliers
Materials
Name
Specification
Metal Bonding AdhesiveTA-1, TA-1-B, 3M™ 08115, LORD Fusor® 108B, Henkel Teroson EP 5055
-
Seam SealerTA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-
Flexible Foam Repair3M™ 08463, LORD Fusor® 121
-..
Removal
NOTE:
Removal steps in this procedure may contain installation details.
Place the roof opening panel shield to the fully OPEN position.
Place the roof opening panel glass to the VENT position.
NOTE:
LH side shown, RH side similar.
Remove the retainers.
Tor..