Ford Ecosport: Roof Opening Panel / Specifications
Specifications
|
Item
|
Specification
|
|
Sliding glass panel to roof flushness, front
|
-0.02 ± 0.04 in (-0.5 mm ± 1.0 mm)
|
|
Sliding glass panel to roof flushness, rear
|
0.02 ± 0.04 in (0.5 ± 1.0 mm)
|
Overview
The roof opening panel consists of the following:
Air deflector
Roof opening panel frame
Roof opening panel glass
Roof opening panel motor
Roof opening panel shield
Roof opening panel drain hoses
Roof opening panel control switch
Trough assembly
The
roof opening panel motor must be initialized when repairs are..
Other information:
1.5L Duratorq-TDCi shown, All others similar
Item
Description
1
Receiver drier element
2
Condenser
3
A/C compressor outlet line
4
A/C compressor
5
A/C compressor inlet line
6
A/C pressure transducer
7
Condenser outlet line
8
Evaporator inlet and outlet manifold
9
Thermostatic..
Inspection
NOTE:
Procedure 1 — Ambient Temperature between 21°C (70°F) and 38°C (100°F)
NOTE:
Variable compressors may not stroke up unless the ambient
temperatures are above 21°C (70°F) when conducting the pressure mapping
procedure. Variable compressor need to see a thermal load on the system
in order to create normal operating pressures.
Run the engine ..