Ford Ecosport: Rear End Sheet Metal Repairs / Removal and Installation - Rear Wheelhouse Outer
Special Tool(s) /
General Equipment
| Spherical Cutter |
| Air Body Saw |
| MIG/MAG Welding Equipment |
| Locking Pliers |
Materials
| Name |
Specification |
Seam Sealer TA-2-B, 3M™ 08308, LORD Fusor® 803DTM |
-
|
Removal
NOTE:
LH side shown, RH side similar.
-
Remove the following items:
-
Refer to: Quarter Panel LH (501-30 Rear End Sheet Metal Repairs, Removal and Installation).
-
NOTE:
Cut-line shown as a guideline, wheelhouse may be sectioned as required to meet repair needs.
Cut damaged portion of the wheelhouse panel and remove.
Use the General Equipment: Air Body Saw
Use the General Equipment: Spherical Cutter
Installation
-
Refer to: Joining Techniques (501-25 Body Repairs - General Information, General Procedures).
-
Cut replacement section from the service panel.
Use the General Equipment: Air Body Saw
Use the General Equipment: Spherical Cutter
-
Install replacement panel and clamp in position.
Use the General Equipment: Locking Pliers
-
Seam weld the entire joint.
Use the General Equipment: MIG/MAG Welding Equipment
-
Metal finish the joint using typical metal finishing techniques.
-
Seam sealing: All seams must be seal to production level.
Material: Seam Sealer
/ TA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-
Refinish the entire repair using a Ford approved paint system .
-
Restore corrosion protection.
Refer to: Corrosion Prevention (501-25 Body Repairs - General Information, General Procedures).
-
Install the following items:
-
Refer to: Quarter Panel LH (501-30 Rear End Sheet Metal Repairs, Removal and Installation).
Special Tool(s) /
General Equipment
Resistance Spotwelding Equipment
8 mm Drill Bit
MIG/MAG Welding Equipment
Spot Weld Drill Bit
Locking Pliers
Materials
Name
Specification
Seam SealerTA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-
Removal
NOTE:
The inner quarter panel is constructed of mild steel and
High-Stre..
Other information:
The roof opening panel motor must be initialized when repairs
are carried out on any part of the roof opening panel system or when
the roof opening panel motor, glass, assembly, or air deflector has been
removed or replaced for any reason.
REFER to: Power Roof Opening Panel Initialization (501-17 Roof Opening Panel, General Procedures).
BCM Module DTC Chart
..
Special Tool(s) /
General Equipment
8 mm Drill Bit
MIG/MAG Welding Equipment
Spot Weld Drill Bit
Locking Pliers
Removal
NOTE:
Factory welds may be substituted with resistance or metal
inert gas (MIG) plug welds. Resistance welds may not be placed directly
over original location. They must be placed adjacent to original
location and match factor..